Under construction at Fincantieri, and the second Viking ocean ship designed to run on hydrogen
Sailings Available
3
Ports Visited
13
Next Departure
Jun 1, 2027
Trip Length
14 nights
Now Booking
Sailings Aboard Viking Astrea
Viking Astrea does not exist yet. She is steel in a Fincantieri shed in Italy, announced for delivery in June 2027, and everything on this page is what has been published rather than what anyone has walked through. The distinction matters more than usual here, because she is not simply another repeat of a design Viking has been building since 2015. She is the second ship in the fleet meant to run on hydrogen.
What has been confirmed
Viking’s own page for her lists 998 guests, 784 feet of length and a 101-foot beam. Those are the Vela-class figures exactly, matching Viking Vela, Viking Vesta and Viking Mira, and both Cruise Industry News and Wikipedia’s fleet table put her at 54,300 gross tons, which is again the class figure. Cruise Industry News reported in March 2026 that she was under construction; delivery is stated as June 2027.
Viking does not market class names, so “Vela class” is a description rather than a badge the line uses. What it stands for is set out on the Viking Vesta and Viking Mira pages and there is no reason yet to think Astrea departs from it: an all-veranda ship of just under a thousand guests, adults only, with a library where another line would put a casino.
The hydrogen part
In April 2025 Viking announced two ships with hydrogen fuel cells, Viking Libra, which was floated out at Ancona in March 2026 and is due at the end of that year, and Viking Astrea behind her. The system is being built by Isotta Fraschini Motori, a Fincantieri subsidiary, and is rated at up to six megawatts. The hydrogen is carried in containers rather than in a permanent integrated tank, and the stated purpose is zero-emission operation in sensitive water (fjords, harbors, protected areas) rather than crossing an ocean on fuel cells.
Six megawatts is not enough to drive a 54,300-ton ship at sea speed by itself, so this is a hybrid arrangement, and Viking has not published how much of a typical voyage would actually run emission-free. That is the single most interesting thing about the ship and also the thing least pinned down. Cruise Industry News reported in July 2026 that Viking Lyra, the 2028 hull, gets the same technology.
What has not been said
There is no godmother, no christening date and no naming port. No deck plan detail worth repeating, no restaurant list confirmed for this hull, no photograph of a finished room. Whether the hydrogen installation costs her any interior space compared with a conventional sister is unknown. Any description of what the Explorers’ Lounge is like aboard Astrea is a description of a different ship.
Where she is scheduled to sail
Europe. On this site she currently has three sailings, all fourteen nights and all departing Venice, spread between June 2027 and June 2028. Cruise Industry News, reporting the announced schedule in March 2025, described a seven-night Mediterranean maiden voyage from Venice, a repositioning from Barcelona to Bergen, and a run of fourteen-night British Isles voyages out of Norway through the summer.
Who she suits
Strictly speaking, nobody yet: booking her is a deposit against a ship that has not been delivered, on a schedule that shipyards routinely move. Repeat Viking guests who like the format and want the newest hull are the obvious audience, along with anyone who cares about the propulsion; this will be one of the first passenger ships in the world carrying hydrogen fuel cells, and being aboard for that is a legitimate reason to book.
She is wrong for anyone who wants to know exactly what they are buying, because nobody outside the yard does. She is wrong for families, as the whole fleet is eighteen and over. And if the hydrogen is not the draw, a Vela-class sister already in service will give you the same ship two years sooner.